Sand-colored stucco home with a timber-covered entry, concrete walk, gravel forecourt, and dormant native plantings in gentle morning light.

Through November, the Agua Fria Detour Runs Into Another Work Zone

By The Agency Santa Fe

"So now there will actually be a full ADA-compliant sidewalk the entire length of Agua Fría from downtown all the way to San Felipe." That's how city project manager Kody Keelin described the end result of the Cottonwood Drive roundabout to The Santa Fe New Mexican when crews broke ground in late August.

That sidewalk is the long-term payoff. For now, eastbound Agua Fria Street is closed at Cottonwood, and the city's detour sends drivers onto a stretch of Airport Road that is still being rebuilt. The hardest weeks of this project are the ones we're in now, the rest of November, before the Airport Road work is scheduled to wrap up.

Why a Roundabout Here

This project goes back to a 2012 road study that flagged the intersection. According to The New Mexican, the corner has averaged 5.5 crashes a year since then, even though traffic through it has dropped about 20% over the same period. Santa Fe Metropolitan Planning Organization Director Erick Aune told the paper that "the geometric/sightline deficiency, not traffic volume or driver behavior are the root cause," and that "a roundabout is the appropriate countermeasure."

Aune also told the paper the city expects traffic through the intersection to rise again as new development in the area fills in.

The City of Santa Fe's project page lists the full scope: a new roundabout, dedicated bike lanes and ADA-compliant sidewalks, designed to meet the New Mexico Department of Transportation's Level of Service A standard. Keelin told The New Mexican the work also adds a Santa Fe Trails bus stop shelter, new curbs and new gutters.

Most of the money comes from outside the city. The New Mexican reports the funding as follows:

Source Amount
Federal Highway Administration, Highway Safety Improvement Program $3 million
City road impact fees $1.089 million
NMDOT local government road fund $87,639
Total reported project cost $4.2 million

The federal safety grant covers nearly three-quarters of the cost. Roughly a quarter comes from road impact fees, which the city charges on new development, the same growth Aune expects to bring traffic back.

How the Detour Works

The city's Orange Barrel Report, updated October 23, 2026, says Agua Fria is closed at the Cottonwood intersection. It gives the detour as Agua Fria to San Felipe Road to Airport Road. The city's separate project page, last updated October 15, describes the eastbound closure at Agua Fria and Fair Way Village. It lays out the full loop like this:

  1. Head east on Agua Fria to the closure, then turn onto San Felipe Road.
  2. Take San Felipe to Airport Road.
  3. Follow Airport Road to South Meadows Road.
  4. Take South Meadows back up to Agua Fria.

Both city pages say local businesses and homes along the closed section can still be reached, and that drivers should follow the posted construction signs. The Orange Barrel Report says work will happen mostly during normal weekday hours, with the schedule subject to weather, utility coordination and other surprises.

The Detour Runs Into Another Work Zone

The detour's middle leg uses Airport Road, which is in the middle of its own project. The same October 23 Orange Barrel Report lists a road rehabilitation on Airport Road between Cerrillos Road and NM-599. That project started in February 2026 and is expected to continue through November 2026. The work includes concrete repairs, asphalt paving, striping and fixes to the sensors that trigger traffic signals, and traffic control will stay in place until it's finished. The city asks drivers to use other routes when they can and to allow extra time.

GM Emulsion, a local company, is the contractor on both projects. The New Mexican notes the company also did earlier Airport Road repaving and the Guadalupe Street reconstruction for the city.

Through the end of November, the detour goes through two work zones. If the Airport Road work finishes as planned, the detour becomes an ordinary drive for the rest of the winter while the roundabout is built.

Route 1 Stops Are Scheduled to Reopen After Sunday

Bus riders have had their own detour. A rider alert on the city's Santa Fe Trails page says Route 1 Agua Fria is detouring onto South Meadows in both directions because of construction at the Agua Fria and Cottonwood stop. All stops from San Felipe to Morning Drive, inbound and outbound, are closed from 9/8 to 11/8.

As of publication on Thursday, November 5, that end date is this Sunday. The alert doesn't list a year and hasn't been updated with a reopening notice, so it's worth calling Santa Fe Trails at 505-955-2001 before you count on your usual stop Monday morning. When the project is done, the Cottonwood stop gets the new shelter Keelin described.

What's Along the Street the Sidewalk Will Connect

Once the sidewalk is continuous, it will link places that already give this part of Agua Fria its character. All of them remain open during construction:

  • San Isidro Historic Church, 3694 Agua Fria Street, still holds services, according to the parish. The New Mexican dates the adobe church to 1835.
  • Agua Fría Village is recognized as a Traditional Historic Community. The Agua Fría Village Association shares oral histories and online exhibits and runs a History, Arts & Culture Center.
  • Romero Park, formerly Agua Fria Park, covers 82 acres along the Santa Fe River off Caja del Oro Grant Road. The Nancy Rodriguez Community Center is part of the park, at 1 Prairie Dog Loop.
  • San Isidro River Park and Trail starts at San Isidro Crossing. Santa Fe County's open space listings describe a 0.7-mile trail from its parking area to Agua Fria Park.
  • Tumbleroot Brewery and Distillery's Agua Fria Taproom, 2791 Agua Fria Street, Units 3–4, serves food and drinks and often has live music, according to its New Mexico True listing.
  • Plants of the Southwest has its Santa Fe store and its Kitchen at 3095 Agua Fria Street.
  • Santa Fe Baptist Church is at 4977 Agua Fria Street.

Each of these is reachable from either direction. Depending on where you start, getting there now may mean the San Felipe and Airport Road loop.

When It Opens, and Why the City Expects to Finish on Time

The city's two pages give different finish dates. The October 15 project page says May 2027. The October 23 Orange Barrel Report, which is newer, says work is expected to run through summer 2027. The New Mexican reported 180 workdays and a summer 2027 finish. It also quoted project manager Romella Glorioso-Moss saying winter weather could pause the work.

The city is also working against its own record a short distance east. The paper notes that the Agua Fría and South Meadows intersection, which got upgrades and a new traffic signal earlier this year, ran years past its original deadline. Part of the delay was a long wait for the signal itself, and a power pole wasn't moved out of the road until close to completion. A roundabout needs no signal. The city also started relocating PNM power poles and CenturyLink and Comcast fiber lines in March, months before construction began. "We have a much tighter deadline and a tighter rein on this project than the Agua Fría-South Meadows intersection," Keelin told The New Mexican.

Either city estimate puts the finish in the spring or early summer of 2027, close to the village's own calendar. The San Ysidro River Blessing, a feast-day procession from San Isidro Church to the river, is held around May 15, according to the Santa Fe Watershed Association. The New Mexican reports it has taken place since at least 1999. The city's latest updates are on the Orange Barrel Report, and project manager Kody Keelin can be reached at [email protected].

At Plaza Group Santa Fe, we follow how projects like the Cottonwood roundabout change everyday life along Agua Fria, from the walk to San Isidro Church to the drive home. If you'd like to talk about what the corridor's next chapter means for your own plans, we'd be glad to have that conversation. Schedule a Private Consultation.

Say Hello!

Giving our clients a curated experience is our number one goal and easing the process of buying and selling homes is our passion.

Follow Us on Instagram